Assemble
Capital

Insights

Do SB 684 Homes Need a DRE Public Report? The Fee-Simple Exemption Explained

· October 24, 2026

General information only. This article is educational and is not legal, tax, financial, lending or investment advice. Do your own due diligence and confirm everything with your own qualified professionals before relying on it. Read the full disclaimer.

One of the least discussed advantages of a fee-simple SB 684 project is what it can avoid: the California Department of Real Estate (DRE) public report. For many subdivisions, a public report is required before homes can be sold, and getting one adds an application, a review period, fees and months of time. Structured correctly, a fee-simple small-lot project in a city usually doesn’t need one.

What a Public Report Is

Under California’s Subdivided Lands Law, a subdivider generally has to file a notice of intention with the DRE and obtain a public report before selling lots in a subdivision. The report discloses information about the project to buyers. It is designed for consumer protection, and for condominiums and planned developments with shared ownership, it is an important one. For a handful of completed single-family homes on their own lots in a city, the law provides an exemption.

The Exemption: Bus. & Prof. Code §11010.4

Section 11010.4 says no notice of intention, and therefore no public report, is required for an offering of subdivided land that meets all of these conditions:

ConditionWhat it means for an SB 684 project
Inside a cityEach lot is located entirely within the boundaries of a city, not unincorporated county land
Completed homesEach lot is sold with a completed home and the improvements needed to occupy it, or with completion arrangements the city finds adequate
Not a common-interest projectThe project is a standard subdivision of separate lots, not a condominium, planned development, stock cooperative or similar structure
Blanket-encumbrance rulesThe subdivider complies with the law’s rules on blanket loans (such as a construction loan covering all the lots), so each buyer receives clear title to their lot

Why Fee-Simple SB 684 Projects Fit

A typical SB 684 project on the Westside checks every box. The lots are in a city such as Los Angeles, Culver City or Santa Monica. Each home sits on its own fee-simple lot with its own parcel number. There is no condominium map and no commonly owned building. And homes are sold one at a time as they are completed. That is why we sell completed homes rather than lots, and why the fee-simple path matters.

What Can Break the Exemption

  • Selling lots before homes are finished, without completion arrangements the city accepts
  • Common areas owned together, such as a jointly owned driveway or courtyard that turns the project into a planned development. Access is usually handled with easements instead; see shared driveways and maintenance agreements.
  • Choosing a condo or TIC structure, which brings the project back under the public report rules (see TIC vs. condo)
  • Unincorporated locations, which fall outside the city requirement
  • Loan structures that don’t let each lot be released from a blanket loan at closing

Why It Matters

Avoiding a public report removes a separate state approval from the critical path between finished homes and closings. Fewer months between completion and sale means less interest on the construction loan and a simpler sales process. It is one more reason fee-simple small-lot homes are a cleaner product than condominiums on the same site.

This is a general summary of California law, not legal advice. Whether a specific project qualifies depends on its facts and structure; confirm with real estate counsel and, where appropriate, the DRE.

Frequently Asked Questions

What is a DRE public report?
A disclosure document issued by the California Department of Real Estate for many subdivision sales. Obtaining one involves an application, review and fees, and it can add months to a project.

Do SB 684 homes need a DRE public report?
Often not. Under Business and Professions Code §11010.4, no DRE filing is required when each lot is in a city, is sold with a completed home, the project is not a condominium, planned development or similar common-interest project, and the law's blanket-encumbrance rules are met.

What would require a public report on an SB 684 project?
Selling lots before the homes are complete (without city-approved completion arrangements), structuring the project as a condominium or planned development with commonly owned areas, or a site outside city limits, among other things.

Do condos need a DRE public report?
Generally yes. Condominiums, planned developments and other common-interest developments are subdivisions that typically require a public report before units are sold.

Important Disclaimer

This article is published by Assemble Capital for general informational and educational purposes only. It is not legal, tax, accounting, lending, appraisal, real estate brokerage or investment advice, and it is not an offer to sell or a solicitation of an offer to buy any security. Laws, regulations, government programs, lending practices, market conditions and local procedures change often and vary by jurisdiction and by property. The information here may be incomplete, out of date or not applicable to your situation, and we have no obligation to update it.

No one, including investors, lenders, property owners, buyers, sellers, agents, brokers, wholesalers or developers, should rely on this article in making any decision. Before acting on any topic discussed here, independently verify the information and conduct your own due diligence with qualified legal, tax, financial, lending, appraisal and real estate professionals and the applicable government agencies.

References to projects, timelines, approvals, appraisals, financing, prices or market conditions are illustrative, may change, and are not predictions, promises or guarantees of any result. Past performance is not indicative of future results.

Reading this article or contacting us does not create an attorney-client, advisory, fiduciary, agency, brokerage or other relationship with Assemble Capital, its affiliates or its principals. Assemble Capital makes no representation or warranty, express or implied, as to the accuracy, completeness or timeliness of this content and, to the fullest extent permitted by law, disclaims all liability for any loss or damage arising from any reliance on it. Use of this site is subject to our Terms of Service and Risks & Disclosures.

Work With Us

Investing, or Have a Property?

For investorsGet to Know Us Learn how we work with investors and schedule an intro call with a principal. We share project-specific information only once we’ve gotten to know you. Schedule an intro callHow we work with investors →
For owners, agents & wholesalersSubmit a Property Infill lots that fit SB 684 and SB 1123, and luxury remodel opportunities. Every submission gets a yes, a no, or our questions within two business days. Submit a propertySee our buy box →

Contacting us is not an offer, commitment or investment. Any offering is made only through definitive offering documents to eligible investors with whom we have a pre-existing relationship.